Follow us on Facebook

coba coba coba

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Selasa, 14 Maret 2017

Contoh Perhitungan perkerasaan jalan raya

Perencanaan tebal lapisan perkerasaan jalan raya 

Untuk merencanaan tebal perkerasan jalan diperlukan data-data sebagai berikut :

1) Panjang jalan 2.5 km        : 2500m
2) Peran jalan         : Jalan kolektor
        Jalan kolektor                 : Jalan yang melayani dan menghubungkan kota-kota antar pusat kegiatan                                                      wilayah dan pusat kegiatan lokaal dan atau kawasan-kawasan berskala                                                         kecil
3) Tipe jalan                : 2 Lajur 2 arah tanpa median
4) Usia Rencana        : 10 Tahun
5) Waktu pelaksanaan        : 3 Tahun, dimulai pada tahun 2016
6) Kelandaian jalan 3%
7) Curah hujan rata-rata per tahun : 650 mm/tahun
8) Jenis lapisan yang dipergunakan :
a. Lapisan permukaan         : laston
b. Pondasi atas         : batu pecah kelas A
c. Pondasi bawah          : sirtu kelas B



TABEL DATA CBR
0 m         7 %                                                          1500 m         5 %
250 m 4 %                                                          1750 m     5 %
500 m 6 %                                                          2000 m         9 %
750 m 10 %                                                  2250 m         7 %
1000 m 6 %                                                          2500 m         4 %
1250 m 3 %

Dimana sample diambil di setiap 250 m..
Tabel data LHR pada tahun 2016

No Jenis kendaraan                             Jumlah lalu lintas (Bulan/hari/2 Jalur)
1 Mobil penumpang                                                18000
2 Bus                                                                        1000
3 Truk 2 As                                                                5570
4 Truk 3 As                                                                 4785
5 Truk 2 As + Gandengan                                         4059
6 Truk 3 As + Gandengan                                         3589
7 Trailer                                                                 1273

II . Perencanaan tebal lapisan perkerasan jalan baru




Keterangan :
  1. LHR : Lalu Lintas harian rata – rata 
  2. N : Rentang waktu
  3. : Perkembangan Lalu Lintas
  4. LEP : Lintas Ekivalen Permulaan
  5. LEA : Lintas Ekivalen Akhir


Nilai LHRp
LHRp = LHR Data . 〖( 1 + ί1 )〗^N1

Mobil penumpang : 18000 ( 1 + 0,05 )3 = 20837              kendaraan/bulan/2Jalur
Bus                         : 6000 ( 1 + 0,05 )3 = 6945              kendaraan/bulan/2Jalur
Truk 2 As                 : 5570 ( 1 + 0,05 )3 = 6448              kendaraan/bulan/2Jalur
Truk 3 As                 : 4785 ( 1 + 0,05 )3 = 5539              kendaraan/bulan/2Jalur
Truk 2 As + Gandengan : 3507 ( 1 + 0,05 )3 = 4059              kendaraan/bulan/2Jalur
Truk 3 As + Gandengan : 3100 ( 1 + 0,05 )3 = 3589              kendaraan/bulan/2Jalur
Trailer                 : 1100 ( 1 + 0,05 )3 = 1273              kendaraan/bulan/2Jalur

Nilai LHRA
LHRA = LHR Data . 〖( 1 + ί2 )〗^N2

Mobil penumpang : 20837 ( 1 + 0,1 )10=54046             kendaraan/bulan/2Jalur
Bus                          : 6945 ( 1 + 0,1 )10= 18014             kendaraan/bulan/2Jalur
Truk 2 As                 : 6448 ( 1 + 0,1 )10= 16724             kendaraan/bulan/2Jalur
Truk 3 As                 : 5539 ( 1 + 0,1 )10= 14367             kendaraan/bulan/2Jalur
Truk 2 As + Gandengan : 4059 ( 1 + 0,1 )10= 10528             kendaraan/bulan/2Jalur
Truk 3 As + Gandengan : 3589 ( 1 + 0,1 )10= 9309               kendaraan/bulan/2Jalur
Trailer                 : 1273( 1 + 0,1 )10=3302            kendaraan/bulan/2Jalur

Tabel Kendaraan diperoleh dari buku perencanaan tebal perkerasan lentur, “Silvia Sukirman”, Hal 89 .


RUMUS :
E Sumbu Tunggal :[(beban sumbu tunggal)/8160]^4
E Sumbu Ganda :[(beban sumbu ganda)/8160]^4






CBR max        = 10
CBR min        = 3

Untuknilai R tergantung dari jumlah data yang terdapat dalam 1 segmen besarnya nilai R seperti yang di perlihatkan pada table di bawah ini :

CBR segmen = CBR rata-rata - ((CBR max-CBR min)/3,18)
CBR segmen = 6 ¬- ((10-3)/3,18)
        = 3,8
  • Menentukan Tebal Lapisan Perkerasan
  •  Menentukan nilai DDT (DayaDukung Tanah)
dari hasil pemeriksaan data CBR, kita dapat menentukan nilai DDT dengan cara berikut :

DDT = 4,3 . log (cbr segmen) + 1,7
DDT = 4,3 . log 3,8 + 1,7
        = 4,3.0,579 + 1,7
DDT = 4,1897

Adapun dengan carag rafis bias menggunakan nomogram pada gambar 

Menentukan factor regional
Direncanakan jalan Arteri dengan kelandaian 3 % dan curah hujan 650 mm/tahun.
Presentasekendaraanberat = (jumlah kendaraan berat)/(jumlah semua kendaraan) x 100 %
Presentase kendaraan berat=(6000+5570+4785+3507+3100+1100)/(18000+6000+5570+4785+3507+3100+1100) x 100%

          = 24062/42062 x 100%

               = 57,206 %

Faktor regional berdasarkan data diatas :
  1. Kelandaian 3 %
  2. Curah hujan 650 mm/tahun
  3. % kendaraan berat = 57,206 %

Nilai FR dapat kita lihat pada tabel di bawah ini :


Maka diperoleh FR = 1,0 – 1,5 dari tabel 
FR diambil 1,0
Klasifikasi jalan kolektor
Diketahui LER = 114544,1
Sehingga dari data di atas diperoleh ipt = 2,5

Indeks permukaan

  • Indeks permukaan awal (IPo)
          direncanakan dari lapisan Laston dengan roughness ≤ 1000 mm/km
          Sehingga dari tabel 2.4 diperoleh IPo≥ 4

  • Indeks permukaan akhir (IPt)
          Diketahui LER = 114544,1
          Peran jalan = Jalan Arteri
          Sehingga dari data diatas diperoleh IPt = 2,5 (Tabel 2.5)

  • Dengan nilai IPo≥4
                            IPt = 2,5
  Maka digunakan nomogram I 


Dari data LER = 114544,1/bulan : 30 = 3818,14/hari
              DDT = 4,1897 
                 FR = 1,0

Maka dari nomogram 1 diperoleh (ITP) ̅ = 7,45
Sehingga direncanakan susunan lapisan :
Sesuai tabel (2.6) koefisien kekuatan relatif (α)
  • Lapisan permukaan : LASTON (α1) = 0,40
  • Lapisan pondasi atas : Batu pecah kelas A, CBR 100% (α2) = 0,14
  • Lapisan pondasi bawah : Sirtu kelas A (α3) = 0,13

Dari tabel (2.7),dan (2.8) diperoleh
  • D1 minimum (lapisanpermukaan) = 7,5 cm
  • D2 minimum (lapisanfondasiatas) = 20 cm

Dicari D3 (Lapisan pondasi bawah)
(ITP) ̅ = α1D1 + α2D2 + α3D3
7,45= (0,40 . 7,5) + (0,14 . 20) + (0,13 . D3)
7,45= 5,8 + 0,13 D3
D3   = (7,45-5,8)/0,13
D3   = 12,69213 cm
  • Sehingga D3 minimum adalah 13 cm